For offices, factories, plazas and schools

Commercial solar EPC for lower operating costs

A bankable solar project plan that cuts grid exposure, improves cash flow and gives management clear production and payback reporting.

From feasibility and structural audit to procurement, net-metering, commissioning and preventive O&M under one accountable team.

Project size
25kW–1MW

Final size follows sanctioned load and roof capacity

Inverter choice
String / central

Selected for uptime, serviceability and plant layout

Savings target
60–90%

Depends on daytime load and export approvals

Execution
2–6 weeks

Varies by approvals, civil work and capacity

Conversion-first system sizing

Is 25 kW – 1 MW the right solar size for you?

Best ROI appears when production matches working-hour consumption and sanctioned load limits.

Good fit

  • Factories
  • Offices
  • Schools
  • Commercial plazas

Quote carefully if

  • Very low daytime load
  • Short-term leased site
  • Unsafe roof structure
  • No management approval

Turnkey EPC

Feasibility, structural audit, design, financing, install, net-metering and O&M under one roof.

Financing options

CAPEX, OPEX and shared-savings models — pay from savings instead of capital.

SCADA-grade monitoring

Plant-level dashboards, alarm management and quarterly performance reports.

AMC + preventive O&M

Module cleaning, thermal scans, inverter health checks and uptime guarantees.

Transparent BOQ

What is included in this 25 kW – 1 MW package?

Modules
Tier-1 bifacial — Longi / JA / Canadian / Jinko
Inverters
String or central inverters — Huawei / Sungrow / SMA
Mounting
Rooftop, ground-mount or carport — hot-dip galvanized
Monitoring
SCADA, plant controller, weather station, energy meter
Storage (optional)
Industrial BESS — LFP battery banks for peak shaving
Solar engineers checking rooftop panel installation
EPC + financing options
SCADA-grade remote monitoring
AMC + preventive maintenance
Carbon credit reporting available
ROI model
EPC accountability
SCADA monitoring
AMC available
Savings proof

Payback that is easy to understand before you buy.

We calculate savings from actual units, sanctioned load, roof direction and tariff assumptions instead of giving a generic promise.

Yearly saving
Rs 25 Lac – 5 Cr+
Payback period
2.5 – 4 years
Monthly generation
Sized from load study
25-year impact
10x system cost over 25 yrs
Installation process

From bill check to net-metering, handled by one team.

  1. 01

    Site feasibility

    Load study, shading analysis, structural audit and ROI model.

  2. 02

    Engineering & approvals

    Detailed design, BOQ, AEDB licensing and IESCO net-metering approval.

  3. 03

    EPC execution

    Procurement, civil + structural, electrical install, testing and commissioning.

  4. 04

    O&M and reporting

    AMC, SCADA monitoring, preventive maintenance and ESG / carbon reporting.

Local SEO content

Commercial solar for Islamabad and Rawalpindi businesses

We work with plazas in Blue Area, factories in I-9, schools, offices and warehouses that need a solar project with accountable engineering and after-sales.

Blue AreaI-9 IndustrialRawalpindiG-11BahriaDHA

Questions buyers ask before paying

How do we prove ROI?+

We build a unit-by-unit financial model using your bills, sanctioned load, roof area and tariff category.

Can you handle approvals?+

Yes. Our team manages drawings, net-metering coordination and commissioning documents.

What happens after handover?+

Optional AMC covers cleaning, thermal scans, inverter checks, reports and response SLAs.

Get the exact 25 kW – 1 MW quote for your roof.

Share your bill and location. ITC will confirm whether this package is right or recommend a better-sized system.